Cross River Rail Construction: Current Station Closures and Service Changes Across Brisbane

Cross River Rail construction continues to affect parts of Brisbane’s rail network through the second half of 2026, with one station closed for an extended period and periodic weekend and evening service changes on several lines.

What changed

Moorooka station has been closed since 2 March 2026 for Cross River Rail construction and accessibility upgrade works, with Translink advising the closure will continue until late 2027. Passengers who would normally use Moorooka are directed to alternative nearby stations and bus replacement information published by Translink.

On the Shorncliffe line, Cross River Rail testing has required temporary changes to some evening services during 2026, with trains not running between Northgate and Shorncliffe on specific days when testing is scheduled, generally from around 7:45pm until the last service of the night. Separately, Airtrain has scheduled rail replacement buses on the Gold Coast line between Bowen Hills and Banoon over the weekend of 29 to 31 August 2026 for track work.

Construction at Fairfield station is now substantially complete, with only minor finishing works continuing at that site.

Why it matters

These changes affect day-to-day commuting for residents near the Moorooka, Shorncliffe, and Gold Coast line corridors, particularly anyone relying on Moorooka station, which remains closed for well over a year in total. Evening and weekend disruptions are generally temporary and tied to specific testing or track work windows rather than permanent timetable changes, but they can still affect travel planning if you are not checking service alerts in advance.

What to verify before you act

If your commute passes through the affected corridors, check Translink’s live service alerts and journey planner before travelling, since testing and track work dates can shift. For anyone assessing a property near Moorooka station specifically, confirm the current closure timeline directly with Translink or Cross River Rail rather than assuming the station is operating, and factor the extended closure into any assessment of walking-distance transport access for that address.

Sources

  • Cross River Rail, Travel Impacts, crossriverrail.qld.gov.au
  • Translink, Cross River Rail project updates, translink.com.au
  • Airtrain, Service Changes, airtrain.com.au

This article is general information current at the time of publication and is not travel or property advice. Service changes, testing dates, and construction timelines can change. Always confirm current service information directly with Translink or Cross River Rail before travelling or making a decision based on transport access.

Join The Discussion